An acquisition rests on line capacity, unit cost and the working-capital cycle before any target list. Incentives and location are added to that base. The institution’s name and the accounts stay closed until a non-disclosure agreement.
The decision base
Engineering and operating feasibility
Nameplate capacity is separated from actual output through the machine park, cycle time, scrap and the shift pattern. The bottleneck asset and tool life are the first screen.
Incentive certificate and location
The incentive certificate, organised-zone infrastructure, energy, logistics and skilled labour are compared in one table. The incentive rate does not choose the site on its own.
CAPEX, OPEX and return
Capital spend, operating cost and the working-capital need sit in one cash model. The return remains a range, with the sensitivity of the assumptions. No price is published.
Cost drivers
Raw material, energy, the certification threshold and customer concentration are read from the shop floor. The thesis has to sit on the sector’s actual constraint.
Target search
In Turkey and Europe, businesses that fit the criteria move from a long list to a short list. First contact is a blind teaser.
The transaction
Technical and financial due diligence
Machines, the quality system, contracts and working capital are reviewed on one calendar. A finding is tied to price, warranty or a condition to closing.
Acquisition strategy
A full transfer, a staged purchase or a new plant is separated by the capacity gap and the time to licence.
Partnership and joint venture
Control, funding and risk sharing are written as operating rights before a share percentage.
Deal structure
The share or asset path is chosen with the liabilities taken over, third-party consent and the payment calendar. The funding discussion is prepared. Haltin is not a lender.
Operations after closing
Line yield, supply and the reporting rhythm can be watched in the first period. Integration stays an annex to closing.